We are Taurant

"TPL is one the leading EPC/LSTK Companies in South Asia with over 25 year of Experience".

Taurant Projects Ltd (TPL) is an engineering, procurement and construction company focusing on cross country oil, gas and water pipelines (having laid upto 50kms pipeline in a single project), city gas pipeline, civil infrastructure, processing of municipal solid waste, renewable energy generation and horizontal directional drilling having its own fleet of HDD rigs ranging from 100T to 550T capacity along with specialised rock tools having executed HDD crossings upto 1500m and 30" OD.

Quality assurance

Past 25 years, TPL is known for the execution of quality work in India. It can be understood from the projects which have been successfully completed since inception of the company in 1996. TPL has developed and adopted a stringent procedure to ensure that quality can't be compromised at any stage of the project.

Social responsibility

TPL is primarily focusing on creating "India's most valuable social Infrastructure" that is more sustainable and acceptable. As a part of the diversified community, accessibility of basic requirements is a major idea behind the CSR activities of TPL. Activities include accessibility of water, adequate sanitization facilities, educational opportunities, increasing energy efficiency by way of renewing it for society at large.

Total initial planning

Completing the operation plans further adds to the overall business plan. Business Structure and other Set-up Elements.

First working process

Our Working ProcessIn 3 Steps. The first step in our engagement is to get behind the stated business issues or symptoms and do a comprehensive diagnostic.

Cost effective Solution

Cost effective Solution: The price of something is the amount of money that you have to pay in order to buy it.

QUALITY GUARANTEED

Expedition, Quality assurance and control is also monitored and controlled from corporate office. Periodical visits are made by personnel form corporate office, coordination cell to project sites and if required outside agencies are also involved for this purpose. Project sites are managed by project Managers supported by Engineers of various fields such as QC-QA, welding/Piping , mechanical, civil, structural, electrical, instrumentation and safety, PERT, Time management, cost control and Quality of work are given prime importance.

Image

00

Year of Establishment

00 +

Projects Completed

00 +

Major Equipments Owned

00 +

Active Site Locations

Our Services

Image

City Gas distribution Networks & Open cut pipeline laying.

CGD system is a pipeline system for the transport of gas and its distribution among consumers. The distribution system includes gas distribution mains and service lines. The pressure is regulated in the system and is usually designed as closed ring or loop systems, to ensure uninterrupted gas supply. City Gas Distribution (CGD) is a growing business sector and it aims to provide an uninterrupted supply of gas to domestic, commercial and industrial customers in the form of pipelined natural gas (PNG) and compressed natural gas (CNG).

Image

Horizontal Directional Drilling(HDD).

Horizontal Directional Drilling (HDD) is a construction technique whereby a tunnel is drilled under a waterway or other designated area, and a pipeline or other utility is pulled through the drilled underground tunnel. The drilling mud also helps coat the walls of the tunnel and remove drill cuttings. It is undoubtedly a unique preposition of installing underground pipelines, cables, and service conduit through trenchless methods.

Image

Renewable Energy Generation

With the changing power scenario throughout the world, TPL has its firm focus on non-conventional sources of energy benefitting the society and the world as a whole. TPL has been able to utilize the benefits of using Municipal Solid Waste (MSW) to generate electricity (Directly and via pellete form) alongwith diversification into Solar Energy also.

Image

Open Cut Pipe Laying

This method is usually the least expensive method if the pipe is located under non‐pavement areas such as a front or back yard. The open cut trench method involves excavating down to and exposing the existing pipe so that it can be repaired or replaced and then backfilled. excavation is located in a non‐pavement area the excavation can be backfilled with soil and surface vegetation.

Image

Oil and Gas Pipeline Construction

Installing and maintaining oil and natural gas pipeline systems can be a major undertaking, but TPL is equipped with the innovation, capabilities and resources to meet any demand on time and on budget. Our crews have been a part of some of the largest oil and natural gas pipeline construction jobs across the continent and have laid thousands of miles of pipeline through some of its most challenging terrain.